The railway is 422.4 km long. Passenger trains operate during the day and freight trains at night. The railway was officially opened on 2 Dec 2021, Lao National Day (1 year ahead of schedule). Construction began in December 2016. In the north, the line will be connected to the Chinese rail system in Mohan, through the Yuxi–Mohan Railway.
